logo

Solar Energy Program I - Solar 4 Kosovo I (100 MW photovoltaic plant)

Sector: Power Generation (CCGT) • Location: Kosovo

Source: KFW Bank aus Verantwortung

Project
Active

The Kosovo energy sector is characterized by high greenhouse gas emissions, which result from the increasing energy demand and the inefficient use of mostly outdated and fossil generation capacities. The diversification of energy sources is low in Kosovo. Electricity generation is mainly based on coal-fired power (94%), which is generated in the two outdated power plants Kosovo A and B. The energy

Project Information FAQ

Project Information

5 Q
The project “Solar Energy Program I - Solar 4 Kosovo I (100 MW photovoltaic plant)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kosovo. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Kosovo energy sector is characterized by high greenhouse gas emissions, which result from the increasing energy demand and the inefficient use of mostly outdated and fossil generation capacities. The diversification of energy sources is low in Kosovo. Electricity generation is mainly based on coal-fired power (94%), which is generated in the two outdated power plants Kosovo A and B. The energy sector causes around 75% of total greenhouse gas emissions in Kosovo. Kosovo's national energy strategy 2022-2031 envisages the decarbonization of the energy sector by 2050. This includes the construction of new wind and solar capacities and thus covering 35% of electricity demand with renewable energies by 2031. The project includes the construction of a photovoltaic system with an installed capacity of 100 MW. The module goal is a significant reduction in greenhouse gases in the energy sector through the expansion of renewable energies. The project sponsor is the state-owned energy producer Kosovo Energy Corporation (KEK). The target group of the project is all residents in Kosovo who are connected to the electricity supply network.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data