logo
ProjectBid Results

Solar Farm Construction REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Construction of a 1.8 MW ac / 2.4 MW dc Solar Farm in Shediac, New Brunswick

Status
Closed
Sector
Power Generation (CCGT), Raw Materials, Solar, Commercial
Location
Shediac, New Brunswick, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Solar Farm Construction REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solar Farm Construction REBID” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Shediac, New Brunswick, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a 1.8 MW ac / 2.4 MW dc Solar Farm in Shediac, New Brunswick

Procurement method

Location

Country

Canada

State

New Brunswick

City

Shediac

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Solar, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project