Solar Power Project BIM 2
Sector: Solar • Location: Vietnam
Source: World Bank Group
The project entails the construction of a 250 MW in Ninh Thuan province, Vietnam. The facility is being jointly developed by BIM Group and AC Energy, the energy arm of Philippine group Ayala Corp. Rizal Commercial Banking Corporation (RCBC) is the sole lender for an undisclosed loan. AC Energy will take part with a 30% voting stake and a roughly 50% economic share. The plant is expected to to ente
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project entails the construction of a 250 MW in Ninh Thuan province, Vietnam. The facility is being jointly developed by BIM Group and AC Energy, the energy arm of Philippine group Ayala Corp. Rizal Commercial Banking Corporation (RCBC) is the sole lender for an undisclosed loan. AC Energy will take part with a 30% voting stake and a roughly 50% economic share. The plant is expected to to enter into service in time for the June 2019 solar feed-in tariff (FiT) deadline. Previously the two company decided to jointly develop a 30 MW solar plant. Financial close took place on August 13, 2018. On 27.04.2019 it was announced that the construction of Solar Power Project BIM 2 has been completed. https://renewablesnow.com/news/ac-energy-bim-group-plan-over-300-mwp-of-solar-in-vietnam-623881/ https://www.acenergy.com.ph/2018/08/13/ac-energy-and-bim-group-scale-up-vietnam-solar-project/ https://bimgroup.com/en/news/bim-group-officially-opening-3-solar-power-plants |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
