logo
ProjectConstruction Documents

Solar Project 2.5 MW

One of 10,000+ projects Taiyo tracks in New York.

Source: Dodge

2.5 MW on 9.75 acres. Solar panels with an east-west tracing system and a new 1,000-foot gravel access road off Stone Road. The system will be interconnected to the local Rochester Gas & Electric grid.

Status
Closed
Sector
Solar, Power Transmission, Commercial, Power Generation (CCGT), Road
Location
North Rose, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Solar Project 2.5 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solar Project 2.5 MW” is an infrastructure initiative in the Solar sector, located in North Rose, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2.5 MW on 9.75 acres. Solar panels with an east-west tracing system and a new 1,000-foot gravel access road off Stone Road. The system will be interconnected to the local Rochester Gas & Electric grid.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

North Rose

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Solar, Power Transmission, Commercial, Power Generation (CCGT), Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project