Solar River solar battery hybrid project
Sector: Solar • Location: South Australia, Australia
Source: Renew Economy
Zen Energy's hybrid Solar River project is a 230 MW solar facility with a co-located battery providing up to 2,048 MWh of storage, located north of the Bundey substation in South Australia. The battery is connected behind-the-meter to the solar farm and can charge directly from it. Construction is expected to commence in 2025 and supply electricity in 2027.
- Status
- Prospective
- Sector
- Solar, Raw Materials, Energy Storage, Power Generation (CCGT)
- Location
- South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Renew Economy
ConstructChat
Ask ConstructChat about Solar River solar battery hybrid project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Zen Energy's hybrid Solar River project is a 230 MW solar facility with a co-located battery providing up to 2,048 MWh of storage, located north of the Bundey substation in South Australia. The battery is connected behind-the-meter to the solar farm and can charge directly from it. Construction is expected to commence in 2025 and supply electricity in 2027. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | South Australia |
Source
Source | Renew Economy |
URL |
More Details
Record type | Project |
Sector | Solar, Raw Materials, Energy Storage, Power Generation (CCGT) |
Article published date | 2025-11-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
