Solar Rooftop Investment Program (Tranche 2)
Sector: Residential • Location: India
Source: Asian Development Bank (ADB)
3.On 25 April 2024, the SBI and NABARD, through the Government, submitted to ADB formal periodic financing requests for the tranche 2 loan to be provided to the SBI and the tranche 3 loan to be provided to NABARD. Each periodic financing request is aligned with the framework financing agreement (FFA), which was revised and agreed with the government, the SBI, and NABARD. In the revised FFA, the MF
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 3.On 25 April 2024, the SBI and NABARD, through the Government, submitted to ADB formal periodic financing requests for the tranche 2 loan to be provided to the SBI and the tranche 3 loan to be provided to NABARD. Each periodic financing request is aligned with the framework financing agreement (FFA), which was revised and agreed with the government, the SBI, and NABARD. In the revised FFA, the MFF's roadmap and policy framework are unchanged since the program continues to be a high priority for the government as it works to achieve its intended outcome of increased solar rooftop capacity in India. To enable the SBI and NABARD to implement the subsequent tranches, the MFF availability period was extended from 30 September 2023 to 30 September 2026 (for 10 years) under the major change (footnote5). Further, the Ministry of New and Renewable Energy (MNRE) became the oversight body to supervise overall program implementation in place of the PNB board. Tranches 2 and 3 are being prepared in parallel. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Residential projects in India
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mundra Ultra Mega Power Plant Gujarat
- Tuppadahalli Wind Farm
- SGS Life Science Services Laboratory Facility, Mumbai, Maharashtra
- West Pharmaceutical Services Pharmaceutical Packaging Plant, Sri City, Andhra Pradesh
- GVK Biosciences’ Clinical Pharmacology Unit
- Ford Factory, Gujarat
- Seawoods Grand Central, Navi Mumbai
