Solar Rooftop Investment Program (Tranche 2)
Closed · India
Source: Asian Development Bank (ADB)
3.On 25 April 2024, the SBI and NABARD, through the Government, submitted to ADB formal periodic financing requests for the tranche 2 loan to be provided to the SBI and the tranche 3 loan to be provided to NABARD. Each periodic financing request is aligned with the framework financing agreement (FFA), which was revised and agreed with the government, the SBI, and NABARD. In the revised FFA, the MF
- Status
- Closed
- Sector
- Residential, Waste Processing and Treatment, Solar, Commercial, Raw Materials, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Solar Rooftop Investment Program (Tranche 2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 3.On 25 April 2024, the SBI and NABARD, through the Government, submitted to ADB formal periodic financing requests for the tranche 2 loan to be provided to the SBI and the tranche 3 loan to be provided to NABARD. Each periodic financing request is aligned with the framework financing agreement (FFA), which was revised and agreed with the government, the SBI, and NABARD. In the revised FFA, the MFF's roadmap and policy framework are unchanged since the program continues to be a high priority for the government as it works to achieve its intended outcome of increased solar rooftop capacity in India. To enable the SBI and NABARD to implement the subsequent tranches, the MFF availability period was extended from 30 September 2023 to 30 September 2026 (for 10 years) under the major change (footnote5). Further, the Ministry of New and Renewable Energy (MNRE) became the oversight body to supervise overall program implementation in place of the PNB board. Tranches 2 and 3 are being prepared in parallel. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Residential, Waste Processing and Treatment, Solar, Commercial, Raw Materials, Government |
Article published date | 2025-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Construction of the Aga Hall Estate, a high-rise residential project (2 towers of 45 and 56 stories) in Mumbai (India)
- SEI Surya Lab Private Limited
- Salasar Highways Private Limited
- First Solar Telangana Power Plant
- Vijayawada Machiliapatnam Expressways Limited
- SB Energy Solar plant 350-MW