Solar Rooftop Investment Program (Tranche 2)

Closed · India

Source: Asian Development Bank (ADB)

3.On 25 April 2024, the SBI and NABARD, through the Government, submitted to ADB formal periodic financing requests for the tranche 2 loan to be provided to the SBI and the tranche 3 loan to be provided to NABARD. Each periodic financing request is aligned with the framework financing agreement (FFA), which was revised and agreed with the government, the SBI, and NABARD. In the revised FFA, the MF

Status
Closed
Sector
Residential, Waste Processing and Treatment, Solar, Commercial, Raw Materials, Government
Location
India
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Solar Rooftop Investment Program (Tranche 2)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Solar Rooftop Investment Program (Tranche 2)” is an infrastructure initiative in the Residential sector, located in India. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

3.On 25 April 2024, the SBI and NABARD, through the Government, submitted to ADB formal periodic financing requests for the tranche 2 loan to be provided to the SBI and the tranche 3 loan to be provided to NABARD. Each periodic financing request is aligned with the framework financing agreement (FFA), which was revised and agreed with the government, the SBI, and NABARD. In the revised FFA, the MFF's roadmap and policy framework are unchanged since the program continues to be a high priority for the government as it works to achieve its intended outcome of increased solar rooftop capacity in India. To enable the SBI and NABARD to implement the subsequent tranches, the MFF availability period was extended from 30 September 2023 to 30 September 2026 (for 10 years) under the major change (footnote5). Further, the Ministry of New and Renewable Energy (MNRE) became the oversight body to supervise overall program implementation in place of the PNB board. Tranches 2 and 3 are being prepared in parallel.

Original sector

Energy

Budget

Location

Country

India

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Residential, Waste Processing and Treatment, Solar, Commercial, Raw Materials, Government

Article published date

2025-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project