Solar SILVER ROAD
The status, timeline and source of this project. A free account opens every field.
Source: City of New York
installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KWM SIZE (DC ): 3.69 KW SYSTEM SIZE (AC ): 3.42 KVA 9 MODULES: HANWHA Q.PEAK DUO BLK ML-G10+ 410 (SAFE HARBOR MODULE: 0) 9 INVERTERS: ENPHASE IQ8HC-72-M-DOM-US
- Status
- Prospective
- Sector
- Solar, Seaport, Road, Government
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Solar SILVER ROAD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KWM SIZE (DC ): 3.69 KW SYSTEM SIZE (AC ): 3.42 KVA 9 MODULES: HANWHA Q.PEAK DUO BLK ML-G10+ 410 (SAFE HARBOR MODULE: 0) 9 INVERTERS: ENPHASE IQ8HC-72-M-DOM-US |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Solar, Seaport, Road, Government |
Article published date | 2026-02-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in USA
- This old house: Rethinking the retrofit
- Hortech Corporate Campus
- Luther College Carbon Neutrality Initiative
- Solar and Battery Systems for West Arlington Apartments
- Pad-Mounted Transformers Supply Contract
- San Diego Natural History Museum Roof Replacement and Upgrades
- Crimson Orchard Project
- Sunraycer Solar-Storage Projects
