logo

Solar Water Pumping Systems EPC Contract from MSEDCL

Sector: Water Supply and Storage • Location: Maharashtra, India

Source: Scanx

Project
Awarded

Crompton Greaves Consumer Electricals Ltd secured an EPC contract from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for 2000 solar photovoltaic water pumping systems under the PM-KUSUM scheme. The contract includes design, manufacture, supply, installation, testing, and commissioning of the systems across various locations in Maharashtra with a completion timeline of 60 days

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Solar, Manufacturing (Industrial), Warehouse
Location
Maharashtra, India
Updated
22 Jul 2026
Source
Scanx

ConstructChat

Ask ConstructChat about Solar Water Pumping Systems EPC Contract from MSEDCL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solar Water Pumping Systems EPC Contract from MSEDCL” is an infrastructure initiative in the Water Supply and Storage sector, located in Maharashtra, India. Taiyo aggregates data on it from Scanx.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Crompton Greaves Consumer Electricals Ltd secured an EPC contract from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for 2000 solar photovoltaic water pumping systems under the PM-KUSUM scheme. The contract includes design, manufacture, supply, installation, testing, and commissioning of the systems across various locations in Maharashtra with a completion timeline of 60 days from the Notice to Proceed.

Original sector

Energy

Budget

Location

Country

India

State

Maharashtra

Source

Source

Scanx

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Solar, Manufacturing (Industrial), Warehouse

Article published date

2025-12-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project