Solaris Energy Infrastructure Power Contract Expansion
Sector: Power Generation (CCGT) • Location: Houston, Texas, USA
Source: Investing.com UK
Solaris Energy Infrastructure expanded an existing power contract originally signed in February 2026 for more than 500 MW by adding 130 MW and enhanced balance of plant scope, increasing the total contracted project investment by more than 60%. The contract maintains a 10-year tenor with a 5-year extension option.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Investing.com UK
ConstructChat
Ask ConstructChat about Solaris Energy Infrastructure Power Contract Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Solaris Energy Infrastructure expanded an existing power contract originally signed in February 2026 for more than 500 MW by adding 130 MW and enhanced balance of plant scope, increasing the total contracted project investment by more than 60%. The contract maintains a 10-year tenor with a 5-year extension option. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Investing.com UK |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in USA
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
- Lotte Chemical MEG-1 Project
- Fourth Avenue Corridor Utility Replacement - MEP Bidders
- Utility Work on I-75
- Google and Elementl Power Nuclear Energy Partnership
- Tanker On-Shore Power Supply Compatibility Assessment
- East Hampton Circle Reconstruction
- Rice University Data Center Heat to Electricity Project
