SolarReserve Lesedi Solar Plant

One of 10,000+ projects Taiyo tracks in South Africa.

Source: World Bank Group

Lesedi Power Company was created to build, own and operate a 75 MW solar PV facility to be located in Humansrus, South Africa. The project company was the fruit of a joint venture between the US-based solar developer SolarReserve, and the South African companies the Kensani Group and Intikon Energy. Oakleaf Investments was also reported as participating in the consortium.

The project was awarde

Status
Prospective
Sector
Solar, Consumer Products, Power Generation (CCGT), Government, Power Transmission, Commercial
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SolarReserve Lesedi Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SolarReserve Lesedi Solar Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Lesedi Power Company was created to build, own and operate a 75 MW solar PV facility to be located in Humansrus, South Africa. The project company was the fruit of a joint venture between the US-based solar developer SolarReserve, and the South African companies the Kensani Group and Intikon Energy. Oakleaf Investments was also reported as participating in the consortium. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). The PPA would be for 20 years with the South African state utility Eskom. Total project cost was estimated at USD 300 million, with comissioning expected for 2014. In November 2012 the project reached financial close. Final total project cost was USD 294 million, with 210 million in debt financing. Debt tenors averaged 19 years and were priced at between 200-300 bps over JIBAR. The sponsors of the project injected USD 74 million, with 12 million in subordinated debt. Rand Merchant Bank, Old Mutual Asset Managers and the Development Bank of South Africa provided the senior and subordinated debt tranches. http://www.pv-tech.org/news/consortiums_150mw_projects_awarded_preferred_bidder_status_by_south_african

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Consumer Products, Power Generation (CCGT), Government, Power Transmission, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project