logo
ProjectActive

SolarReserve Letsatsi Solar Plant

Sector: Solar • Location: South Africa

Source: World Bank Group

Letsatsi Power Company was created to build, own and operate a 75 MW solar PV facility to be located in Soudrift, South Africa. The project company was a joint venture between the US-based solar developer SolarReserve, the South African companies the Kensani Group and Intikon Energy. Letsatsi Power Company was a consortium between: Kensani Capital Investments (Pty) Ltd, SolarReserve South Africa

Status
Prospective
Sector
Solar, Commercial, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT)
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SolarReserve Letsatsi Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SolarReserve Letsatsi Solar Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Letsatsi Power Company was created to build, own and operate a 75 MW solar PV facility to be located in Soudrift, South Africa. The project company was a joint venture between the US-based solar developer SolarReserve, the South African companies the Kensani Group and Intikon Energy. Letsatsi Power Company was a consortium between: Kensani Capital Investments (Pty) Ltd, SolarReserve South Africa (Pty) Ltd and Oakleaf Investment Holdings (Pty) Ltd. Solar Reserve South Africa was a subsidiary of US-based SolarReserve. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). The PPA would be for 20 years with the South African state utility Eskom. Total project cost was estimated at USD 300 million, with comissioning expected for 2014. Kensani Eaglestone Capital Advisory (Pty) Ltd was the financial advisor of the project. Rand Merchant Bank, a division of FirstRand Bank Limited, was the lead arranger and underwriter. In November 2012 the project reached financial close. The toal project cost was USD 280 million. 70 million was provided in equity by the sponsors, with an additional 10 million subordinated debt tranche. Debt was provided by the Development Bank of South Africa, Rand Merchant Bank and Old Mutual. http://www.pv-tech.org/news/consortiums_150mw_projects_awarded_preferred_bidder_status_by_south_african

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Commercial, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project