Solarta Suphanburi Solar Plant
Sector: Power Generation (CCGT) • Location: Bangkok, Thailand
Source: World Bank Group
As of February 2012, Solarta Co. Ltd was a solar energy development company with a focus on developing utility scale assets in Thailand. In The Solarta - Suphanburi was a 34.25 MW photovoltaic project to be located in the Ayudhaya, Suphanburi and Nakorn Pathom provinces. The Project developer was a joint venture between SET-listed Ratchaburi Electricity Holding and Yanhee Solar Power Co. Ltd. T
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | As of February 2012, Solarta Co. Ltd was a solar energy development company with a focus on developing utility scale assets in Thailand. In The Solarta - Suphanburi was a 34.25 MW photovoltaic project to be located in the Ayudhaya, Suphanburi and Nakorn Pathom provinces. The Project developer was a joint venture between SET-listed Ratchaburi Electricity Holding and Yanhee Solar Power Co. Ltd. The project was to consist of 8 distinct solar farms. The project would operate under the Very Small Power Producer (VSPP) model, a program that program uses the "bonus model" of feed-in tariff design where the final tariff paid is composed of "adders" on top of the avoided wholesale cost of generation. 10 year PPA with State Owned Utility. Revenue support includes an "adder" Feed in Tariff of THB 8 (USD 0.26 cents) over the market price of power for solar projects. The project reached financial close in June 2011. 75% of the USD 142.5 million total project cost was financed by loans from KASIKORNBANK Public Company Limited and Bangkok Bank Public Company Limited, with the rest from equity from the joint venture partners. All 8 solar farms in the Suphanburi project were scheduled for commissioning by the end of 2011. http://www.bakermckenzie.com/news/BMSolartaEightSolarFarmProjects/ http://www.renewableenergyworld.com/rea/news/article/2010/12/thailand-4300-mw-of-renewables-with-feed-in-tariffs |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
