logo

Soleco Energy Jamaica

Sector: Solar • Location: Jamaica

Source: Inter-American Development Bank (IADB)

Project
Inactive

The proposed operation consists of the financing of: (i) the development, construction, operation and maintenance of a portfolio of distributed generation assets in Jamaica, including ground mounted, rooftop and carport solar photovoltaic (“PV”) installations as well as energy storage solutions and interconnection facilities (each, an “Installation”) with an initial aggregate generating capacity o

Project Information FAQ

Project Information

4 Q
The project “Soleco Energy Jamaica” is an infrastructure initiative in the Solar sector, located in Jamaica. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

inactive

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed operation consists of the financing of: (i) the development, construction, operation and maintenance of a portfolio of distributed generation assets in Jamaica, including ground mounted, rooftop and carport solar photovoltaic (“PV”) installations as well as energy storage solutions and interconnection facilities (each, an “Installation”) with an initial aggregate generating capacity of approximately 11.25 mega-watt peak (“MWp”), which will be contracted with commercial and industrial clients through long-term lease contracts (“Phase I”); and (ii) a subsequent set of Installations for additional generation capacity following the same long-term leasing structure (“Phase II”). Together, (i) and (ii) are the “Project”. The construction period is expected to be no longer than 12 months. The Project developer, Soleco Energy Limited (“SEL” or the “Company”) manages the Engineering, Procurement and Construction (“EPC”) and Operations and Maintenance (“O&M”) works contracted to Grupotec Servicios Avanzados, S.A. (or “Grupotec”) for Phase I of the Project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data