Soledad ERF Interim Housing Site Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project includes site development work for the Soledad ERF Interim Site Housing a footprint of 145x135, please see the attached plans for a site plan that includes minor concrete work, site grading, and constructing vegetated swales in preparation for modular buildings, clearing and grubbing. Modular Building work includes, utility connections water, sewer, and electrical to the modular build
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Cement, Consumer Products, Power Transmission, Government, Commercial
- Location
- Soledad, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Soledad ERF Interim Housing Site Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes site development work for the Soledad ERF Interim Site Housing a footprint of 145x135, please see the attached plans for a site plan that includes minor concrete work, site grading, and constructing vegetated swales in preparation for modular buildings, clearing and grubbing. Modular Building work includes, utility connections water, sewer, and electrical to the modular buildings and associated utility work, concrete foundation footings, and seismic fastening anchoring. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Soledad |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Cement, Consumer Products, Power Transmission, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
