logo
ProjectEnded

Solid Oxide Stack Lean Manufacturing

Sector: Power Generation (CCGT) • Location: Italy, Austria, Switzerland, Germany

Source: EU Funding & Tenders Portal

The proposed SOSLeM project will contribute to the call objectives by improving production processes as well as developing and applying novel manufacturing technologies for FC stacks. The improvements proposed by the project will sum up to a reduction of manufacturing costs of about 70%, leading to decreased capital cost of about 2.500 €/kW. Besides these outstanding economical and technical impr

Status
Closed
Sector
Power Generation (CCGT), Manufacturing (Industrial), Water Supply and Storage
Location
Italy, Austria, Switzerland, Germany
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Solid Oxide Stack Lean Manufacturing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Solid Oxide Stack Lean Manufacturing” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Italy, Austria, Switzerland, Germany. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed SOSLeM project will contribute to the call objectives by improving production processes as well as developing and applying novel manufacturing technologies for FC stacks. The improvements proposed by the project will sum up to a reduction of manufacturing costs of about 70%, leading to decreased capital cost of about 2.500 €/kW. Besides these outstanding economical and technical improvements, production material will be spared and environmental benefits will be realized. Specifically, the project will: - Develop new and optimized processes for cassettes production, by avoidance brushing of cassettes, improved sealing adhesion on cassettes, automation of welding, lean manufacturing processes and anode contact layer laser welding, - Improve stack preparation, by advanced glass curing and stack conditioning and improved gas stations, - Enable environmental benefits by Cu-based instead of Co-based powder and evaluation of On-site Nickel removal from waste water - Reduce production time and costs and improve flexibility, by large furnace arrangement, introduction of a multi-stack production station, examination of substituting Co-based powder by Cu-based power, Examination of partially substituting Co-based powder by enamel coating and simultaneous sintering.

Location

Country

Italy, Austria, Switzerland, Germany

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial), Water Supply and Storage

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project