Solid Waste Container Facility
Design development · Texas · Last reported Mar 2025
Source: Dodge
Replacement of the building's damaged exterior panels, interior insulation, and restroom finishes and fixtures. Includes updates to fire alarm system, air conditioning in the restrooms, and site grading and concrete pad
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Biomass, Waste Processing and Treatment, Airport, Cement
- Location
- Irving, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Solid Waste Container Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of the building's damaged exterior panels, interior insulation, and restroom finishes and fixtures. Includes updates to fire alarm system, air conditioning in the restrooms, and site grading and concrete pad |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Irving |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Biomass, Waste Processing and Treatment, Airport, Cement |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
