Solid Waste Convenience Center and Recycling Facility Phase1
Sector: Water Supply and Storage • Location: Fayetteville, North Carolina, United States of America
Source: Dodge USA
Cumberland County Solid Waste Management intends to construct a 3.81-acre solid waste convenience center and recycling facility at 575 Assembly Court, Fayetteville, NC 28306. This facility shall be constructed in two (2) phases. Phase 1 of construction includes installation of all erosion and sedimentation control measures, entrance and driveway construction and paving, parking area construction a
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Biomass, Road, Government, Consumer Products, Automotive
- Location
- Fayetteville, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Solid Waste Convenience Center and Recycling Facility Phase1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cumberland County Solid Waste Management intends to construct a 3.81-acre solid waste convenience center and recycling facility at 575 Assembly Court, Fayetteville, NC 28306. This facility shall be constructed in two (2) phases. Phase 1 of construction includes installation of all erosion and sedimentation control measures, entrance and driveway construction and paving, parking area construction and aggregate surfacing, chain link fence installation, vegetative buffer installation, and water ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Fayetteville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Biomass, Road, Government, Consumer Products, Automotive |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
