logo

Solid Waste IWTF Intake Pump Station

Sector: Biomass • Location: St. Petersburg, Florida, United States of America

Source: Dodge USA

Project
Closed

The Work set forth within these bid documents includes the furnishing of all labor, materials, equipment, services and incidentals for: Civil site work, including excavation and grading, slope stabilization and access ramp and associated swales, cofferdams and protective sheeting systems required to perform the work. Demolition of existing intake pumps, associated piping, electrical panels and 28

Status
Closed
Sector
Biomass, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial
Location
St. Petersburg, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Solid Waste IWTF Intake Pump Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solid Waste IWTF Intake Pump Station” is an infrastructure initiative in the Biomass sector, located in St. Petersburg, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work set forth within these bid documents includes the furnishing of all labor, materials, equipment, services and incidentals for: Civil site work, including excavation and grading, slope stabilization and access ramp and associated swales, cofferdams and protective sheeting systems required to perform the work. Demolition of existing intake pumps, associated piping, electrical panels and 28 associated components, and flow control devices. One intake screen, including floating intake sys...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

St. Petersburg

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Biomass, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project