logo
ProjectClosed

Solid Waste Management Project

Sector: Water Supply and Storage • Location: Bosnia and Herzegovina

Source: World Bank Group

The main objectives of the Solid Waste Management Project are to: 2) cost effectively improve solid waste services in participating priority areas; b) increase administrative and technical capacity for solid waste management at the local and Entity level; c) improve cost recovery in the sector and encourage private sector involvement; and d) correct environmental problems and reduce health hazards

Status
Closed
Sector
Water Supply and Storage, Biomass, Commercial, Waste Processing and Treatment, Government
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Solid Waste Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Solid Waste Management Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Solid Waste Management Project are to: 2) cost effectively improve solid waste services in participating priority areas; b) increase administrative and technical capacity for solid waste management at the local and Entity level; c) improve cost recovery in the sector and encourage private sector involvement; and d) correct environmental problems and reduce health hazards caused by inadequate waste collection and disposal systems. There are three project components beside the project management component. The Waste Management component rehabilitates landfill sites by closing wild dumps, building collection infrastructure and support equipment, and establishingn transfer stations. The Institutional Strengthening component supports a public communication program, environmental monitoring, and the formation of a medium-term business plan. The Engineering Services/Technical Assistance component provides engineering services for design and construction supervision, and technical assistance for waste management and landfill operations.

Original sector

FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Bosnia and Herzegovina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Commercial, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project