logo
ProjectGc Bidding

Solid Waste Office Expansion

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Office. GC Bids to Owner Public - Local November 24 at 09:00 AM (EST)

Status
Prospective
Sector
Electric Vehicles (EVs), Biomass, Power Generation (CCGT), Warehouse, Rail, Road, Forest Products and Packaging, Manufacturing (Industrial), Metal, Residential, Power Transmission
Location
South Bend, Indiana, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Solid Waste Office Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solid Waste Office Expansion” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in South Bend, Indiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

gc bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Office. GC Bids to Owner Public - Local November 24 at 09:00 AM (EST)

Original sector

Water, Sanitation And Waste Management

Budget

Location

Country

United States of America (USA)

State

Indiana

City

South Bend

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Biomass, Power Generation (CCGT), Warehouse, Rail, Road, Forest Products and Packaging, Manufacturing (Industrial), Metal, Residential, Power Transmission

Article published date

2026-11-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project