Solid Waste Transfer Station Construction
Sector: Waste Processing and Treatment • Location: Carrollton, Georgia, United States of America
Source: Dodge
CARROLL COUNTY IS PROPOSING TO CONSTRUCT A NEW ~ 20K SF TRANSFER STATION ON THEIR EXISTING UNDEVELOPED PROPERTY AT 439 SIMONTON MILL ROAD, CARROLLTON GA. THE NEW BUILDING WILL REPLACE THE EXISTING OPEN AIR FACILITY THAT IS CURRENTLY IN OPERATION.THE PROJECT SCOPE WILL BE THE CONSTRUCTION OF THE BUILDING AND ACCESS RAMP, SCALE FOUNDATIONS, FIRE SUPPRESSION AND UTILITIES SHOWN ON THE ATTACHED DRAWIN
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Metal, Government, Manufacturing (Industrial)
- Location
- Carrollton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Solid Waste Transfer Station Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CARROLL COUNTY IS PROPOSING TO CONSTRUCT A NEW ~ 20K SF TRANSFER STATION ON THEIR EXISTING UNDEVELOPED PROPERTY AT 439 SIMONTON MILL ROAD, CARROLLTON GA. THE NEW BUILDING WILL REPLACE THE EXISTING OPEN AIR FACILITY THAT IS CURRENTLY IN OPERATION.THE PROJECT SCOPE WILL BE THE CONSTRUCTION OF THE BUILDING AND ACCESS RAMP, SCALE FOUNDATIONS, FIRE SUPPRESSION AND UTILITIES SHOWN ON THE ATTACHED DRAWINGS. CARROLL COUNTY WILL SELF PERFORM THE REMAINING REQUIRED SITE WORK FOR VEHICULAR CIRCULATION. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Carrollton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Metal, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
