Solids Handling Facility Improvements PHASE 2
Closed · Arkansas · Last reported Jul 2024
Source: Dodge USA
This is a necessary infrastructure project dedicated to managing and improving biosolids production, processing, and handling at the existing pollution control facility. The project centers around the installation of two (2) Huber belt dryers, a 98 x140 pre-engineered metal building, an addition and renovation to the existing maintenance building, tubular drag conveyance, electrical improvements,
- Status
- Closed
- Sector
- Commercial, Waste Processing and Treatment, Metal, Power Generation (CCGT), Government, Manufacturing (Industrial), Water Supply and Storage
- Location
- Rogers, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Solids Handling Facility Improvements PHASE 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a necessary infrastructure project dedicated to managing and improving biosolids production, processing, and handling at the existing pollution control facility. The project centers around the installation of two (2) Huber belt dryers, a 98 x140 pre-engineered metal building, an addition and renovation to the existing maintenance building, tubular drag conveyance, electrical improvements, instrumentation improvements, plumbing improvements, and HVAC upgrades. Additionally, the project... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Rogers |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Waste Processing and Treatment, Metal, Power Generation (CCGT), Government, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
