SOLLID RD BRIDGE-20M E CONRAD
Planned · Montana
Source: Montana Department of Transportation (MDT)
The purpose of the project is to replace the existing deteriorated bridge with a new structure. The project is necessary to provide a drainage crossing that will meet the needs of industry and the traveling public. Some roadwork will be performed to match the geometry of the new bridge. New guardrail will also be provided to increase safety at this location.
- Status
- Prospective
- Sector
- Bridge, Road, Government, Waste Processing and Treatment
- Location
- Montana, United States of America
- Updated
- 19 Nov 2026
- Source
- Montana Department of Transportation (MDT)
ConstructChat
Ask ConstructChat about SOLLID RD BRIDGE-20M E CONRAD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to replace the existing deteriorated bridge with a new structure. The project is necessary to provide a drainage crossing that will meet the needs of industry and the traveling public. Some roadwork will be performed to match the geometry of the new bridge. New guardrail will also be provided to increase safety at this location. |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Department of Transportation (MDT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Waste Processing and Treatment |
Article published date | 2024-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
