logo

Somalia - Feasibility Study, Preliminary and Detailed Engineering Design, ESIA and preparation of tender documents for Upgrading 183-Km Hargeisa-Odweine-Burao Road in Somaliland

Sector: Government • Location: Somalia

Source: African Development Bank (AfDB)

Project

This intervention concerns the Feasibility Study, Detailed Engineering Design and ESIA of Upgrading 183-Km Hargeisa - Odweine - Burao Road. It aims to undertake a full feasibility study, Detailed Engineering Design and Environmental and Social Impact Assessment (ESIA) for the Upgrading of 183-Km Hargeisa- Odweine-Burao Road from Gravel to Bitumen Standard. This is a gravel road in poor condition a

Project Information FAQ

Project Information

4 Q
The project “Somalia - Feasibility Study, Preliminary and Detailed Engineering Design, ESIA and preparation of tender documents for Upgrading 183-Km Hargeisa-Odweine-Burao Road in Somaliland” is an infrastructure initiative in the Government sector, located in Somalia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention concerns the Feasibility Study, Detailed Engineering Design and ESIA of Upgrading 183-Km Hargeisa - Odweine - Burao Road. It aims to undertake a full feasibility study, Detailed Engineering Design and Environmental and Social Impact Assessment (ESIA) for the Upgrading of 183-Km Hargeisa- Odweine-Burao Road from Gravel to Bitumen Standard. This is a gravel road in poor condition and a vital missing link in IGAD Economic Transport corridors, prioritized in the recently completed IGAD Regional Infrastructure Master Plan 2020 to 2050. The current driving distance between two towns via Berbera City is around 296 km and driving time around 5 hours. The proposed new road will reduce the driving distance from 296Km to 183 Km and driving time to less than 2 hours when paved. This study comprises the following components: (i) Feasibility Study, (ii) Project management, Workshops, Monitoring & Evaluation and (iii) Project Financial Audit.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data