Somalia - Feasibility Study, Preliminary and Detailed Engineering Design, ESIA and preparation of tender documents for Upgrading 183-Km Hargeisa-Odweine-Burao Road in Somaliland
Sector: Government • Location: Somalia
Source: African Development Bank (AfDB)
This intervention concerns the Feasibility Study, Detailed Engineering Design and ESIA of Upgrading 183-Km Hargeisa - Odweine - Burao Road. It aims to undertake a full feasibility study, Detailed Engineering Design and Environmental and Social Impact Assessment (ESIA) for the Upgrading of 183-Km Hargeisa- Odweine-Burao Road from Gravel to Bitumen Standard. This is a gravel road in poor condition a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This intervention concerns the Feasibility Study, Detailed Engineering Design and ESIA of Upgrading 183-Km Hargeisa - Odweine - Burao Road. It aims to undertake a full feasibility study, Detailed Engineering Design and Environmental and Social Impact Assessment (ESIA) for the Upgrading of 183-Km Hargeisa- Odweine-Burao Road from Gravel to Bitumen Standard. This is a gravel road in poor condition and a vital missing link in IGAD Economic Transport corridors, prioritized in the recently completed IGAD Regional Infrastructure Master Plan 2020 to 2050. The current driving distance between two towns via Berbera City is around 296 km and driving time around 5 hours. The proposed new road will reduce the driving distance from 296Km to 183 Km and driving time to less than 2 hours when paved. This study comprises the following components: (i) Feasibility Study, (ii) Project management, Workshops, Monitoring & Evaluation and (iii) Project Financial Audit. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
