logo

Somalia - Road Infrastructure Programme (RIP)

Sector: Commercial • Location: Somalia

Source: African Development Bank (AfDB)

Project

The Road Infrastructure Programme aims to improve management of the road sector at the national level and improve transport connectivity for road users in the targeted road corridors for rehabilitation while reinforcing the capacities of federal and regional institutions that manage road infrastructure. The programme entails: (i) rehabilitation and surfac

Project Information FAQ

Project Information

4 Q
The project “Somalia - Road Infrastructure Programme (RIP)” is an infrastructure initiative in the Commercial sector, located in Somalia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Road Infrastructure Programme aims to improve management of the road sector at the national level and improve transport connectivity for road users in the targeted road corridors for rehabilitation while reinforcing the capacities of federal and regional institutions that manage road infrastructure. The programme entails: (i) rehabilitation and surface dressing of 82km (BeledWeyne-Kalabeyr 22km; and Dhusamareb-Qaradhi 60km) of the existing 327km, 7.3m wide Beled Weyne-Galkayo paved road; (ii) rehabilitation and surface dressing of 85 km(Galkayo-Faratoyo) of the existing 240 km, 7.3 m wide Galkayo-Garowe paved road; (iii) rehabilitation and construction of the existing 80km, 7.3m wide Luuq, Ganane-Dolow earth road to gravel road standard; and (iv) new construction of 100 km, 7.3m wide Galkayo-Elgula (part of 241km Galkayo-Hobyo feeder road) to compacted gravel standard and Feasibility study, environmental and social impact assessment and detailed engineering design of 280 km Lowyaddo-Farddaha-Borama road.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data