Somerset Lake Trail Phase 2B
Sector: Commercial • Location: Somerset Township, Pennsylvania, United States of America
Source: Dodge USA
The project scope of work includes clearing the area of the proposed trail, general excavation and cut/fill operations to establish the trail subgrade and placing and compacting the trail surface aggregate. Work also includes installation and maintenance of erosion and sediment control structures and restoration of disturbed areas after construction is complete.
- Status
- Closed
- Sector
- Commercial, Car parking, Mass Transit, Automotive, Rail, Government
- Location
- Somerset Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Somerset Lake Trail Phase 2B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope of work includes clearing the area of the proposed trail, general excavation and cut/fill operations to establish the trail subgrade and placing and compacting the trail surface aggregate. Work also includes installation and maintenance of erosion and sediment control structures and restoration of disturbed areas after construction is complete. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Somerset Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Mass Transit, Automotive, Rail, Government |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
