Song Bung 6 Hydropower Plant

Sector: Hydro • Location: Vietnam

Source: World Bank Group

Project
Active

Song Bung JSC was planning the development of the 29 MW Song Bung 6 Hydropower Plant, on the Bung river, Ma Cooih commune and Ka Dang commune in Dong Giang district, Thanh My town, in Nam Giang district, Quang Nam province.

The project was to sign a PPA with EVN for the 120.52 GWh annually produced and transmitted to the national grid via a 110kV transmission line of 13 km, connecting to the 22

Project Information FAQ

Project Information

4 Q
The project “Song Bung 6 Hydropower Plant” is an infrastructure initiative in the Hydro sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Song Bung JSC was planning the development of the 29 MW Song Bung 6 Hydropower Plant, on the Bung river, Ma Cooih commune and Ka Dang commune in Dong Giang district, Thanh My town, in Nam Giang district, Quang Nam province. The project was to sign a PPA with EVN for the 120.52 GWh annually produced and transmitted to the national grid via a 110kV transmission line of 13 km, connecting to the 220/110kV Thanh My transformer station. Commissioning was expected for 2013. The plant was to consist of 2 turbines of 15.091 MW each with an expected life of 30 years. The equipment supply contract was signed with a Chinese supplier in November 2010. Construction was estimated to last 2.5 years, O&M was expected to cost VND 6.344 billion (1%). The electricity price was expected to be VND 784.91/kWh ($0.0377/kWh). The feasibility study for the 26 MW variant of the plant was finalised in March 2009. The Investment permit was awarded in October 2009 by the provincial committee. The feasibility study for the 29MW version was finalised in April 2010. The EPC contract was signed in September 2010. The generation permits were issued in March 2010 (Department of Industry and Trade) and April 2011 (Provincial committee). Total investment was estimated at VND 634.4 billion ($30.5 million). The date of FC was unknown, but assumed here was December 2010. The project applied for UNFCCC/CDM financing. http://cdm.unfccc.int/filestorage/N/5/4/N5490MV6LK1H3EUPITROC7FDJYWG8Z/20111122_Song%20Bung%206_PDD_clean.pdf?t=S1l8bTIyZjBqfDAB0CKad5YjUMDomQEgaPU7

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data