Song Mien 5 Hydropower Plant

Sector: Road • Location: Vietnam

Source: World Bank Group

Project
Active

Song Mien 5 Hydro Power JSC was planning the development of the 20MW Song Mien 5 Hydropower Plant, Song Mien River in Thuan Hoa commune, Vi Xuyen district, Ha Giang province. The project was expected to generate 66.67 GWh annually, sold to the grid via a PPA signed with EVN.

The project was expected to include the upgrade of roads to the communes, and a 110kV transmission line for output transm

Project Information FAQ

Project Information

4 Q
The project “Song Mien 5 Hydropower Plant” is an infrastructure initiative in the Road sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Song Mien 5 Hydro Power JSC was planning the development of the 20MW Song Mien 5 Hydropower Plant, Song Mien River in Thuan Hoa commune, Vi Xuyen district, Ha Giang province. The project was expected to generate 66.67 GWh annually, sold to the grid via a PPA signed with EVN. The project was expected to include the upgrade of roads to the communes, and a 110kV transmission line for output transmission. The project included 2 Francis vertical shaft turbines of 10.417MW each, an two Synchronous 3 phases vertical axis generators of 10MW each. the Feasibility study was finalized in August 2009, the construction contract was signed in February 2010. The equipment supply contract was signed in March 2010. The project applied for UNFCCC/CDM financing, the credits were bought by the Nordic Environment Finance Corporation (NEFCO). The equipment was to be supplied by the winner of a tender. Commissioning was expected for March 2012. The project lifespan was 30 years. Construction was 2.5 years. Electricity price was estimated at VND 685.49 per kWh ($0.0329 per kWh). Total investment was estimated at VND 382.764 billion ($18.4 million). Financial closure date was unknown. Assumed here is February 2010 (signing construction agreement). http://cdm.unfccc.int/filestorage/C/0/O/C0OG75FSZ6HRK89JTUBA2E3WLMNIXP/PDD%20Song%20Mien%205C.pdf?t=NFJ8bTIyd2F6fDB0NCngMzcKncxcH2102ehV Sponsor needs to be added. All info from UNFCCC/CDM application (PDD)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data