logo

Songa Energy Ruvyironza River hydropower project

Sector: Water Supply and Storage • Location: Burundi

Source: World Bank Group

Project
Active

"The project comprises the development of 1.65-MW run-of-river power plant on the Ruvyironza River in Burundi. The sponsor is Anzana Electric Group, previously called Virunga Power, and the construction company is its subsidiary Songa Energy. The investment is $7.7 m. African Trade & Investment Development Insurance (ATIDI) agency has provided political risk insurance cover for the equity investme

Project Information FAQ

Project Information

4 Q
The project “Songa Energy Ruvyironza River hydropower project” is an infrastructure initiative in the Water Supply and Storage sector, located in Burundi. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"The project comprises the development of 1.65-MW run-of-river power plant on the Ruvyironza River in Burundi. The sponsor is Anzana Electric Group, previously called Virunga Power, and the construction company is its subsidiary Songa Energy. The investment is $7.7 m. African Trade & Investment Development Insurance (ATIDI) agency has provided political risk insurance cover for the equity investment of the sponsor for $7.7 million. ATIDI's political risk insurance will cover the risk of default by the Government of Burundi following an arbitral award under the project agreements. The electricity generated by the project will be sold exclusively to the Burundian national power and water utility, La Régie de Production et de Distribution de l'Eau et de l'Electricité (REGIDESO) under a 25-year power purchase agreement (PPA). The power from the hydro project will be delivered to the national grid via a new 2.4km transmission line that will be constructed as part of the project." https://www.burunditimes.com/atidi-backs-7-7-million-hydro-project-in-burundi/#:~:text=The%201.65%20MW%20project%20is,Award%20under%20the%20Project%20Agreements. ; https://ethiopianmonitor.com/2024/03/21/atidi-backs-songa-energys-1-65mw-hydro-project-in-burundi/ ; https://www.songaenergy.com/ruvyironza-groundbreaking/ ; https://www.atidi.africa/about-us/who-we-are/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data