Songa Energy Ruvyironza River hydropower project
Sector: Water Supply and Storage • Location: Burundi
Source: World Bank Group
"The project comprises the development of 1.65-MW run-of-river power plant on the Ruvyironza River in Burundi. The sponsor is Anzana Electric Group, previously called Virunga Power, and the construction company is its subsidiary Songa Energy. The investment is $7.7 m. African Trade & Investment Development Insurance (ATIDI) agency has provided political risk insurance cover for the equity investme
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | "The project comprises the development of 1.65-MW run-of-river power plant on the Ruvyironza River in Burundi. The sponsor is Anzana Electric Group, previously called Virunga Power, and the construction company is its subsidiary Songa Energy. The investment is $7.7 m. African Trade & Investment Development Insurance (ATIDI) agency has provided political risk insurance cover for the equity investment of the sponsor for $7.7 million. ATIDI's political risk insurance will cover the risk of default by the Government of Burundi following an arbitral award under the project agreements. The electricity generated by the project will be sold exclusively to the Burundian national power and water utility, La Régie de Production et de Distribution de l'Eau et de l'Electricité (REGIDESO) under a 25-year power purchase agreement (PPA). The power from the hydro project will be delivered to the national grid via a new 2.4km transmission line that will be constructed as part of the project." https://www.burunditimes.com/atidi-backs-7-7-million-hydro-project-in-burundi/#:~:text=The%201.65%20MW%20project%20is,Award%20under%20the%20Project%20Agreements. ; https://ethiopianmonitor.com/2024/03/21/atidi-backs-songa-energys-1-65mw-hydro-project-in-burundi/ ; https://www.songaenergy.com/ruvyironza-groundbreaking/ ; https://www.atidi.africa/about-us/who-we-are/ |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
