logo
Project

SONGHUA RIVER BASIN WATER POLLUTION CONTROL AND MANAGEMENT PROJECT PRIVATE SECTOR FACILITY

The status, timeline and source of this project. A free account opens every field.

Source: Asian Development Bank (ADB)

The project is the first phase of ADB's support to LJEP in addressing severe environmental degradation in the PRC's Songhua River Basin. Phase 2 expands LJEPs' operations into sludge treatment and improves the technical parameters of its existing WWTP projects. Specifically, it will finance investments to (i) install sludge handling units and the treatment and disposal of approximately 1,200 t/d o

Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government
Location
China
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about SONGHUA RIVER BASIN WATER POLLUTION CONTROL AND MANAGEMENT PROJECT PRIVATE SECTOR FACILITY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SONGHUA RIVER BASIN WATER POLLUTION CONTROL AND MANAGEMENT PROJECT PRIVATE SECTOR FACILITY” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is the first phase of ADB's support to LJEP in addressing severe environmental degradation in the PRC's Songhua River Basin. Phase 2 expands LJEPs' operations into sludge treatment and improves the technical parameters of its existing WWTP projects. Specifically, it will finance investments to (i) install sludge handling units and the treatment and disposal of approximately 1,200 t/d of sludge, and (ii) the upgrade of approximately 300,000 t/d of WWTP capacity to meet higher effluent standards.Phase 1 used the proceeds from ADB financing to finance subprojects, which are held either directly by the firm or through wholly-owned subproject company subsidiaries. Both Phase 1 and 2 are envisaged to (i) expedite the delivery of urban water supply, sanitation, and wastewater services in the PRC; (ii) arrest increasing pollution of water resources and reduce threats to public health; and (iii) promote private sector participation in urban water supply, sanitation, and wastewater management in the PRC, among other goals.

Original sector

Water and other urban infrastructure and services

Procurement method

Budget

Location

Country

China

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government

Article published date

2024-11-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project