Sonoco
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The proposed investment is a US$[25] mn senior corporate A loan to Société Nouvelle de Commerce (Sonoco or the Company), a Guinean diversified family business group, to support its expansion. The proposed financing would be used to invest in: (i) a 30k MT wheat storage facility to be located in the port of Conakry; and (ii) the construction of a greenfield food processing unit (seasoning cubes). T
- Status
- Prospective
- Sector
- Residential, Water Supply and Storage, Metal, Consumer Products, Government, Manufacturing (Industrial), Waste Processing and Treatment, Commercial
- Location
- Guinea
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Sonoco
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed investment is a US$[25] mn senior corporate A loan to Société Nouvelle de Commerce (Sonoco or the Company), a Guinean diversified family business group, to support its expansion. The proposed financing would be used to invest in: (i) a 30k MT wheat storage facility to be located in the port of Conakry; and (ii) the construction of a greenfield food processing unit (seasoning cubes). The total Project cost is estimated at US$[35] mn. Apart from this project, Sonoco has a functioning flour mill, and it is currently building a beverage processing plant, an office building, and a metal processing plant. The storage facility will be located on a 0.5 ha land under a 25-year renewable lease owned by the Port Authorities; and the food processing unit will be located on a portion of a 20-ha land under a 75-year lease owned by the Government of Guinea in the industrial zone of Conakry (‘’Commune de Ratomba’’), next to the flour mill. Under the latter lease agreement, the Company will be able to buy the land from the Government as soon as the seasoning cube processing unit is built. During operations, the storage facility will employ 5-10 workers, and the processing unit will employ 30-50 workers. |
Original sector | F-AA - Grain Processing (Milling, Starch, Flour, Malt) |
Location
Country | Guinea |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Residential, Water Supply and Storage, Metal, Consumer Products, Government, Manufacturing (Industrial), Waste Processing and Treatment, Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
