Sopron-Szentgotthard Railway
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project consists of the modernisation of the existing single track railway line between Sopron-Szombathely-Szentgotthard, 116 km, including installation of new ETCS level 2 signalling system and electrification from Szombathely to Szentgotthard. Purchase of four electric multiple units for regional passenger traffic is also foreseen.
- Status
- Prospective
- Sector
- Mass Transit, Rail
- Location
- Hungary
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Sopron-Szentgotthard Railway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | <p>The project consists of the modernisation of the existing single track railway line between Sopron-Szombathely-Szentgotthard, 116 km, including installation of new ETCS level 2 signalling system and electrification from Szombathely to Szentgotthard. Purchase of four electric multiple units for regional passenger traffic is also foreseen.</p> |
Original sector | Transport |
Budget |
Location
Country | Hungary |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
