logo

Soroti Solar Power Plant

Sector: Solar • Location: Uganda

Source: World Bank Group

Project
Active

Soroti Solar Power Plant entails the development and construction of a 10 MW solar power generating facility in Soroti district, Eastern Uganda. The project will also construct a 3 km, 33kV transmission line to feed power into the Ugandan national grid. It will provide 40,000 homes, schools and businesses in the area with low-carbon and sustainable power.

Access Uganda Solar Limited ("Project c

Status
Prospective
Sector
Solar, Power Generation (CCGT), Government, Residential, Commercial
Location
Uganda
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Soroti Solar Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Soroti Solar Power Plant” is an infrastructure initiative in the Solar sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Soroti Solar Power Plant entails the development and construction of a 10 MW solar power generating facility in Soroti district, Eastern Uganda. The project will also construct a 3 km, 33kV transmission line to feed power into the Ugandan national grid. It will provide 40,000 homes, schools and businesses in the area with low-carbon and sustainable power. Access Uganda Solar Limited ("Project company") will implement the project on behalf of the sponsors - Access Power MEA and Eren Group. The electricity generated by the facility will be sold at $0.1637 per kWh for 20 years under a PPA contract to Uganda Electricity Transmission Company Limited backed by a sovereign guarantee from the GoU. The electricity tariff will only cover $0.11 of this payment to the plant owner, with the rest covered by the GET FiT facility through result-based premium payments. The project achieved financial close on 19th of January 2016. The financing package represents 75 percent debt and 25 per cent sponsors' equity contributions, amounting to $3.56 million. The Netherlands Development Finance Company (FMO) provided the $10.7 million term loan, which has a maturity of 17 years. The Netherlands development bank, FMO, arranged and structured the transaction. EAIF contributed $5.35 million to FMO’s total loan. http://www.pv-magazine.com/news/details/beitrag/construction-set-to-begin-on-10-mw-solar-plant-in-uganda_100023263/#axzz4HO2GATJu https://ijglobal.com/data/transaction/32670/soroti-solar-power-plant-10mw http://eaif.com/news-media/view/who-we-benefit http://www.pidg.org/impact/case-studies/uganda-access-uganda-solar-access-soroti a joint venture between Dubai based Access MEA and Luxemburg based Eren Renewable Energy (EREN RE) PPA 20 years

Original sector

Energy

Budget

Location

Country

Uganda

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Government, Residential, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project