Sosian Menengai Geothermal Power Plant
Sector: Geothermal • Location: Nakuru, Nakuru County, Kenya
Source: KBC Digital
The Sosian Menengai plant is the first privately operated geothermal facility at the Menengai field in Kenya, constructed by China's Kaishan Group. It began operations in August 2023 after passing rigorous third-party assessments.
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT)
- Location
- Nakuru, Nakuru County, Kenya
- Updated
- 22 Jul 2026
- Source
- KBC Digital
ConstructChat
Ask ConstructChat about Sosian Menengai Geothermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sosian Menengai plant is the first privately operated geothermal facility at the Menengai field in Kenya, constructed by China's Kaishan Group. It began operations in August 2023 after passing rigorous third-party assessments. |
Original sector | Energy |
Budget |
Location
Country | Kenya |
State | Nakuru County |
City | Nakuru |
Source
Source | KBC Digital |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT) |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
