Soup Chi Restaurant / HOM design and construction company
Sector: Road • Location: Iran
Source: ArchDaily
With regard to the drawbacks in this old building, we came to the conclusion that the best solution and answer in this design process is to use the drawbacks (weak points) of the projects and turn them into advantages (strong points)Therefore, when you look at the facade of the commercial section on the ground floor, you will see a disappointing niche (alcove), a split level, and a weak perspectiv
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | With regard to the drawbacks in this old building, we came to the conclusion that the best solution and answer in this design process is to use the drawbacks (weak points) of the projects and turn them into advantages (strong points)Therefore, when you look at the facade of the commercial section on the ground floor, you will see a disappointing niche (alcove), a split level, and a weak perspective.Text description provided by the architects.This project is located at the beginning of Sattar Khan Street and near Tohid square, the old building of this project is about 40 years ago. After accurate examining and detailed analysis of the building conditions, we faced some important drawbacks; for example, one center line of metal column started from the main facade of the store completely and passed through the middle of the store, and as a result, all the ideas about the design affected the facade negatively and the interior plan of the restaurant.On the other hand, according to the ground rules of construction constituted in that area ofTehranfor forty years ago, after constructing the ground floor section, you could have a 1.5-meter console on the upper floors toward the street and the main facade. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
