South Africa - Eskom Renewables Support Project

Closed · South Africa

Source: World Bank

The objective of the Eskom Renewables Support Project is to facilitate accelerated development of large scale renewable energy capacity in support of the long-term carbon mitigation strategy of South Africa. There are two components to the project, the first component being 100 MW sere wind power plant and associated infrastructure for the connection of wind and renewable IPPs to the grid. The pro

Status
Closed
Sector
Solar, Energy Storage, Power Transmission, Biomass, Wind, Geothermal, Power Generation (CCGT), Raw Materials, Hydro, Forest Products and Packaging, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about South Africa - Eskom Renewables Support Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “South Africa - Eskom Renewables Support Project” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Eskom Renewables Support Project is to facilitate accelerated development of large scale renewable energy capacity in support of the long-term carbon mitigation strategy of South Africa. There are two components to the project, the first component being 100 MW sere wind power plant and associated infrastructure for the connection of wind and renewable IPPs to the grid. The project is fully scoped and specified. Prequalification of contractors and preparation of bid documents for the wind-turbine generators and other associated facilities are at advanced stages. The wind resource in South Africa as a whole is moderate to low, with the estimated highest capacity factor about 26 percent. Taking this into account, as well as the availability and preparedness of the site, including closeness to transmission, availability of long term wind measurement data, safeguards aspects, etc, it was concluded that Sere is the most suitable location for the plant. Based on measurements completed to date at the site, it is expected that the plant will have a load factor of 26 percent. The site is about 40 km from the 132-kV line. Finally, the second component is the 100 MW Upington concentrating solar plant.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

South Africa

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Transmission, Biomass, Wind, Geothermal, Power Generation (CCGT), Raw Materials, Hydro, Forest Products and Packaging, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project