South Africa - Eskom Renewables Support Project
Closed · South Africa
Source: World Bank
The objective of the Eskom Renewables Support Project is to facilitate accelerated development of large scale renewable energy capacity in support of the long-term carbon mitigation strategy of South Africa. There are two components to the project, the first component being 100 MW sere wind power plant and associated infrastructure for the connection of wind and renewable IPPs to the grid. The pro
- Status
- Closed
- Sector
- Solar, Energy Storage, Power Transmission, Biomass, Wind, Geothermal, Power Generation (CCGT), Raw Materials, Hydro, Forest Products and Packaging, Government
- Location
- South Africa
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about South Africa - Eskom Renewables Support Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Eskom Renewables Support Project is to facilitate accelerated development of large scale renewable energy capacity in support of the long-term carbon mitigation strategy of South Africa. There are two components to the project, the first component being 100 MW sere wind power plant and associated infrastructure for the connection of wind and renewable IPPs to the grid. The project is fully scoped and specified. Prequalification of contractors and preparation of bid documents for the wind-turbine generators and other associated facilities are at advanced stages. The wind resource in South Africa as a whole is moderate to low, with the estimated highest capacity factor about 26 percent. Taking this into account, as well as the availability and preparedness of the site, including closeness to transmission, availability of long term wind measurement data, safeguards aspects, etc, it was concluded that Sere is the most suitable location for the plant. Based on measurements completed to date at the site, it is expected that the plant will have a load factor of 26 percent. The site is about 40 km from the 132-kV line. Finally, the second component is the 100 MW Upington concentrating solar plant. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | South Africa |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Power Transmission, Biomass, Wind, Geothermal, Power Generation (CCGT), Raw Materials, Hydro, Forest Products and Packaging, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project