South Africa - Medupi Power Project

Sector: Water Supply and Storage • Location: South Africa

Source: African Development Bank (AfDB)

Project

Medupi power project will stabilise the electricity trade in the Southern Africa Region. It consists of the construction of a coal-fired base load power plant in Lephalale, Limpopo Province, comprising of six units with an installed capacity of 4,764 MW. Although the project is located in Limpopo province, the project will feed into national electricity grid and the entire country will reap benefi

Project Information FAQ

Project Information

4 Q
The project “South Africa - Medupi Power Project” is an infrastructure initiative in the Water Supply and Storage sector, located in South Africa. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Medupi power project will stabilise the electricity trade in the Southern Africa Region. It consists of the construction of a coal-fired base load power plant in Lephalale, Limpopo Province, comprising of six units with an installed capacity of 4,764 MW. Although the project is located in Limpopo province, the project will feed into national electricity grid and the entire country will reap benefits through reliable power supply. The construction of the power plant commenced in May 2008. The first unit will be commissioned by February 2012, and each subsequent unit will be commissioned at an interval of six months. The plant will deploy the super-critical boiler technology with increased plant efficiency, reduced coal consumption and reduced CO2 emissions. These units are planned as direct dry-cooled units such as those at the existing Matimba power station, thereby reducing water consumption requirement in significant ways compared to wet cooling technology. The project is estimated to cost Euro 11.19 billion. USD 60 million has been allocated to climate finance, 100% of which is dedicated to mitigation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data