South Apron Expansion and Aircraft Fueling System
Sector: Airport • Location: Friday Harbor, Washington, United States of America
Source: Dodge USA
To construct. the South. Apron Expansion and Aircraft Fueling System Site Development project at the Friday Harbor Airport. Elements of work for this project include, but are not limited to, approxi-mately 2,500 square yards of new Portland Cement Concrete pavement, site grading, drainage improvements, aircraft. tie-down installation, pavement marking, hydroseeding; and construction of a new aircr
- Status
- Closed
- Sector
- Airport, Aerospace & Defense, Commercial, Seaport, Cement, Road, Power Generation (CCGT), Government, Oil and Gas, Waste Processing and Treatment
- Location
- Friday Harbor, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Apron Expansion and Aircraft Fueling System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To construct. the South. Apron Expansion and Aircraft Fueling System Site Development project at the Friday Harbor Airport. Elements of work for this project include, but are not limited to, approxi-mately 2,500 square yards of new Portland Cement Concrete pavement, site grading, drainage improvements, aircraft. tie-down installation, pavement marking, hydroseeding; and construction of a new aircraft fueling equip meat concrete pad, foundations, and electrical improvements to support the inst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Friday Harbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Aerospace & Defense, Commercial, Seaport, Cement, Road, Power Generation (CCGT), Government, Oil and Gas, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in United States of America
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- AIRPORT ROAD IN VIDALIA - TIA
- ATLANTA-CCO - CRRSA
- DAWSON - CARES ACT
- PROJECT ADMINISTRATION - FAA-3-13-SBGP-04-2009 - FY09 DISCR
- McRAE-ENVIRON. ASSMT. FOR PARALLEL TAXIWAY AREA IMPROVMENT
- REIDSVILLE- FUEL FACILITY CARD READER AND DESIGN OF RUNWAY
