logo

South Australia $3.5bn Power Transmission Project

Sector: Power Generation (CCGT) • Location: South Australia, Australia

Source: The Mercury

Project
Planned

A $3.5 billion power transmission project in South Australia is facing a significant route change due to farmers rejecting plans for 75-metre towers across their properties.

Status
Prospective
Sector
Power Generation (CCGT), Road
Location
South Australia, Australia
Updated
22 Jul 2026
Source
The Mercury

ConstructChat

Ask ConstructChat about South Australia $3.5bn Power Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South Australia $3.5bn Power Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in South Australia, Australia. Taiyo aggregates data on it from The Mercury.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $3.5 billion power transmission project in South Australia is facing a significant route change due to farmers rejecting plans for 75-metre towers across their properties.

Original sector

Energy

Budget

Location

Country

Australia

State

South Australia

Source

Source

The Mercury

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project