South Babb Creek Mitigation
Closed · California · Last reported Jul 2025
Source: Dodge
The Work to be completed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles, and all labor, transportation, and services, including fuel, power, water, and essential communications, and for performing Work or other operations required to construct the South Babb Flood Mitigation Project as illustrated on the Plans and as detailed in
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about South Babb Creek Mitigation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to be completed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles, and all labor, transportation, and services, including fuel, power, water, and essential communications, and for performing Work or other operations required to construct the South Babb Flood Mitigation Project as illustrated on the Plans and as detailed in these Specifications. The project is being constructed to mitigate surface flooding during the 1... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
