South Beach Signature Pedestrian Bridge
Sector: Power Generation (CCGT) • Location: Miami Beach, Florida, United States
Source: WPLG Local 10
A colorful, long-awaited signature pedestrian bridge off the MacArthur Causeway in Miami Beach, intended to welcome residents and visitors to South Beach, has encountered significant issues. Construction started more than a year and a half ago, seven years after the project was proposed, but work has now come to a standstill due to problems locating underground utilities, specifically transmission
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Bridge
- Location
- Miami Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- WPLG Local 10
ConstructChat
Ask ConstructChat about South Beach Signature Pedestrian Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction halted |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A colorful, long-awaited signature pedestrian bridge off the MacArthur Causeway in Miami Beach, intended to welcome residents and visitors to South Beach, has encountered significant issues. Construction started more than a year and a half ago, seven years after the project was proposed, but work has now come to a standstill due to problems locating underground utilities, specifically transmission lines by Florida Power & Light (FPL). The difficulty in accurately locating these lines has caused delays and complications, with concerns that puncturing a line could cause a blackout for months. The developer has provisions to walk away if the project becomes too burdensome, and the city is exploring other bridge options while a third party investigates the situation. |
Original sector | Infrastructure |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami Beach |
Source
Source | WPLG Local 10 |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Bridge |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
