South Bridge Construction Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construct a bridge across the Roaring Fork River, providing access between Colorado Highway 82 and neighborhoods east of Airport Road, according to the city of Glenwood. The project will also pave a second evacuation route connecting the residents of the South Corridor with Highway 82.
- Status
- Prospective
- Sector
- Airport, Bridge, Road, Government, Commercial
- Location
- Glenwood Springs, Colorado, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Bridge Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construct a bridge across the Roaring Fork River, providing access between Colorado Highway 82 and neighborhoods east of Airport Road, according to the city of Glenwood. The project will also pave a second evacuation route connecting the residents of the South Corridor with Highway 82. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Glenwood Springs |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Bridge, Road, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
