logo
ProjectPlanned

South Bridge Project

Sector: Government • Location: Glenwood Springs, Colorado, United States

Source: Post Independent

The South Bridge project in Glenwood Springs involves creating a second connection between Colorado Highway 82 and south Glenwood Springs to provide a critical evacuation route and ease commuter traffic congestion. The project has received a $49.6 million federal grant covering roughly 80% of the cost, with the city responsible for a 20% local match. The city is working with CDOT to complete right

Status
Prospective
Sector
Government, Road, Power Transmission, Power Generation (CCGT), Bridge
Location
Glenwood Springs, Colorado, United States of America
Updated
22 Jul 2026
Source
Post Independent

ConstructChat

Ask ConstructChat about South Bridge Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “South Bridge Project” is an infrastructure initiative in the Government sector, located in Glenwood Springs, Colorado, United States. Taiyo aggregates data on it from Post Independent.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The South Bridge project in Glenwood Springs involves creating a second connection between Colorado Highway 82 and south Glenwood Springs to provide a critical evacuation route and ease commuter traffic congestion. The project has received a $49.6 million federal grant covering roughly 80% of the cost, with the city responsible for a 20% local match. The city is working with CDOT to complete right-of-way acquisition, environmental documentation, and utility clearances before bidding, with construction expected to start in summer 2026 and last about two years.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Glenwood Springs

Source

Source

Post Independent

URL

More Details

Record type

Project

Sector

Government, Road, Power Transmission, Power Generation (CCGT), Bridge

Article published date

2025-11-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project