South Canton Park Improvements REBID
Sector: Water Supply and Storage • Location: Canton, Georgia, United States of America
Source: Dodge
The Project generally consists of the following major items: 1. Site grading 2. Water and sanitary sewer utilities 3. Stormwater conveyance and detention, above and below ground 4. Site lighting 5. Parking lot 6. Restroom building 7. Shade pavilion 8. Small amphitheater and stage 9. Dog parks with splash pads 10. Playgrounds 11. Walking paths/trails 12. Elevated boardwalk 13. Irrigation system wit
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Stadium, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Automotive, Commercial
- Location
- Canton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about South Canton Park Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project generally consists of the following major items: 1. Site grading 2. Water and sanitary sewer utilities 3. Stormwater conveyance and detention, above and below ground 4. Site lighting 5. Parking lot 6. Restroom building 7. Shade pavilion 8. Small amphitheater and stage 9. Dog parks with splash pads 10. Playgrounds 11. Walking paths/trails 12. Elevated boardwalk 13. Irrigation system with cistern 14. Site furnishings 15. Landscaping.SOUTH CANTON PARK IS A PUBLIC PARK PROJECT AND CON... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Canton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Stadium, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Automotive, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
