SOUTH CHESTATEE ST FROM CS 522/CHOICE ST TO CS 530/CHURCH ST
Sector: Power Transmission • Location: Dahlonega, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Downtown Pedestrian and Streetscape Improvements or South Chestatee St from CS 522/Choice St to CS 530/Church St: The project runs along South Chestatee St from Choice St (mile marker 0.05) SE to the College entrance (mile marker 0.18). The project area is approx. 0.13 miles long. The project involves the enhancement of pedestrian and bicyclist facilities with wider sidewalks, improves accessibili
- Status
- Closed
- Sector
- Power Transmission, Manufacturing (Industrial), Road, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Government
- Location
- Dahlonega, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SOUTH CHESTATEE ST FROM CS 522/CHOICE ST TO CS 530/CHURCH ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Downtown Pedestrian and Streetscape Improvements or South Chestatee St from CS 522/Choice St to CS 530/Church St: The project runs along South Chestatee St from Choice St (mile marker 0.05) SE to the College entrance (mile marker 0.18). The project area is approx. 0.13 miles long. The project involves the enhancement of pedestrian and bicyclist facilities with wider sidewalks, improves accessibility and pedestrian connections, improved storm water management, relocation of overhead utilities, and installation of street trees, on-street parking, signage and other pedestrian amenities. In addition, retaining walls will be constructed to address topographic challenges. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Dahlonega |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Manufacturing (Industrial), Road, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
