logo

South Circle Drive Resurfacing

Sector: Water Supply and Storage • Location: California, United States of America

Source: Riverside County

Project
Active

Limits: Begin of work starts at the intersection of S Circle Dr and Pine Crest Ave to SH-243

Length: Approximately 1.8 miles

District: 4 Community: Idyllwild

PROJECT DESCRIPTION:

The County of Riverside Transportation Department is proposing to resurface approximately 1.8 miles of S Circle Dr From Pine Crest Ave to SH-243. S Circle Dr is classified as a Local Collector in the County of Rive

Project Information FAQ

Project Information

4 Q
The project “South Circle Drive Resurfacing” is an infrastructure initiative in the Water Supply and Storage sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Begin of work starts at the intersection of S Circle Dr and Pine Crest Ave to SH-243 Length: Approximately 1.8 miles District: 4 Community: Idyllwild PROJECT DESCRIPTION: The County of Riverside Transportation Department is proposing to resurface approximately 1.8 miles of S Circle Dr From Pine Crest Ave to SH-243. S Circle Dr is classified as a Local Collector in the County of Riverside’s General Plan. S Circle Dr is currently 27 feet wide. The project proposes to resurface the road, as well as reconstruct a section in order to reprofile and improve existing drainage. The proposed project will also include: Adjusting Manholes · Adjusting Water Valves · Constructing 6” AC Dike · Striping of roadway · Salvage/removal and installation of new signs · Reconstruction of AC dike No additional right-of-way will be required to construct the proposed improvements. The project improvements will be within the existing footprint of the roadway.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data