logo

South County Relief Pump Station P-419 Improvements

Sector: Water Supply and Storage • Location: St. Louis, Missouri, United States of America

Source: Dodge

Project
Closed

A general description of the work to be done under these contract documents is as follows: Replacement of existing pipes, valves, pumps, surge tank, HVAC, transformer, controls, motor control center, generator replacement, and Automatic Transfer Switch; repairs to the existing crane rail, installation of monorail and fall protection trolley, and installation of detention piping.

Status
Closed
Sector
Water Supply and Storage, Commercial, Rail, Waste Processing and Treatment, Cable car, Automotive, Telecommunications, Government
Location
St. Louis, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about South County Relief Pump Station P-419 Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “South County Relief Pump Station P-419 Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in St. Louis, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A general description of the work to be done under these contract documents is as follows: Replacement of existing pipes, valves, pumps, surge tank, HVAC, transformer, controls, motor control center, generator replacement, and Automatic Transfer Switch; repairs to the existing crane rail, installation of monorail and fall protection trolley, and installation of detention piping.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

St. Louis

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Rail, Waste Processing and Treatment, Cable car, Automotive, Telecommunications, Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project