South Demonstration Phase 1A Multimodal Path and Sidewalk Project
Sector: Car parking • Location: Tahoe, Nevada/California, United States
Source: Cycling West
Construction of a one-mile trail and sidewalk from Stateline Avenue/Lake Parkway to Laura Drive along U.S. 50 by the Tahoe Transportation District. The project aims to close a gap between existing bike paths and includes installation of curb ramps, lighting, and other safety features to reduce crashes by 25–40 percent.
- Status
- Closed
- Sector
- Car parking, Automotive
- Location
- Tahoe, Nevada/California, United States of America
- Updated
- 22 Jul 2026
- Source
- Cycling West
ConstructChat
Ask ConstructChat about South Demonstration Phase 1A Multimodal Path and Sidewalk Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a one-mile trail and sidewalk from Stateline Avenue/Lake Parkway to Laura Drive along U.S. 50 by the Tahoe Transportation District. The project aims to close a gap between existing bike paths and includes installation of curb ramps, lighting, and other safety features to reduce crashes by 25–40 percent. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Nevada/California |
City | Tahoe |
Source
Source | Cycling West |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
