South Dunhurst Storm Water Improvements Phase 1
Sector: Water Supply and Storage • Location: Wheeling, Illinois, United States of America
Source: Dodge USA
The Village of Wheeling invites you to bid on an anticipated contract for South Dunhurst Stormwater Improvements Phase 1 (hereinafter referred to as the Project ). The Project can generally be described as detention basin construction on the north side of the Mark Twain Elementary School with the installation of approximately 280 linear feet of 72-inch diameter storm sewer from the proposed detent
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Wheeling, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about South Dunhurst Storm Water Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Village of Wheeling invites you to bid on an anticipated contract for South Dunhurst Stormwater Improvements Phase 1 (hereinafter referred to as the Project ). The Project can generally be described as detention basin construction on the north side of the Mark Twain Elementary School with the installation of approximately 280 linear feet of 72-inch diameter storm sewer from the proposed detention basin to East Merle Lane. The scope of the Project shall include all equipment, materials, la... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Wheeling |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
